Surely someone has gone down this rabbit hole already after not accepting “it’s in the BD sheets” as an acceptable reasoning and I’m hoping to gain some insight.
On the last bridge I designed, it was a traditional reinforced deck, and, based on my current understanding, the additional reinforcement in the overhang of the deck had to be designed so the overhang would not fail before the barrier (TL-5).
With an isotropic reinforced deck, this design is not required and it is a prescriptive #6 at 8” with a 2’-6” development past the fascia girder.
The bridge manual in 2014 states the isotropic deck overhang reinforcement is to be designed, but that changed in subsequent issues of the bridge manual.
After going through the process of designing the overhang reinforcement for the traditional reinforced deck and having a better understanding of why that reinforcement is required, I am uneasy about the prescriptive design without some logical reasoning.
I am assuming there has been TL5 barrier tests with the prescriptive isotropic reinforcement for varying overhang widths between the allowances for use with isotropic reinforcement, and I am hoping someone can provide any sort of reference or information on this testing or insight on the reasoning behind this difference between the two types of decks in regards to the additional overhang reinforcement.
Thank you to anyone spending any of their time trying to help me out.