r/EnergyAndPower • • 14h ago

Nuclear Energy is actually chill.

11 Upvotes

Nuclear energy is absolutely the solution to the havoc fossil fuels have caused the earth as well as the growing energy demand. Nuclear power is unmatched in power output (averaging a whopping 1 gigawatt per hour, especially compared to other green energy sources. So naturally I believe this is the way to go, as disasters like Chernobyl are incredibly uncommon when plants are operated correctly. Nuclear energy certainly has its cons and it seems many feel very strongly that it is simply too dangerous, expensive or time consuming to utilize. I can see where one might be coming from with these concerns because they are valid. Although, in general all forms of energy that we use for our grid come with a wide list of downsides and when comparing nuclear power’s downsides to the rest of the options, I believe that it is the most efficient way to satisfy the growing energy demand. While it is very expensive and the time between planning is long, it’s better than relying on other countries' oil and natural gas, especially in the long term. 


r/EnergyAndPower • • 13h ago

Governments turn to renewables for relief from the energy crisis

Thumbnail
ft.com
3 Upvotes

r/EnergyAndPower • • 15h ago

Crude Up, Emissions Down

Post image
2 Upvotes

SciAm: "Oil prices are so high that CO2 emissions from fossil fuels are dropping," by Jackie Flynn Mogensen."

The American-Israeli war in Iran has been the ongoing greatest cause of a drop in annual fossil-fuel carbon emissions. "Between 2019 + 2025, carbon dioxide emissions from fossil fuels grew by about 0.8% annually, according to a new study published in Nature Climate Change." But 2026 is set to buck that trend: high oil prices, as well as the continued rise of green technology—solar power, wind + electric cars—will cause a “short-term” 0.4% drop, according to the study. 

“The high petrol prices following the war in Iran are reducing oil use + keeping emissions low,” says the study’s lead author Corinne Le Quéré, a professor of climate change science at the University of East Anglia in England. “But that’s not the whole story: The expansion of renewable energy has progressed a lot in recent years, led by China." 

The positive trend is that electrified transportation + rising renewable energy including geothermal are offsetting two-thirds of the growing demand for energy. The less positive trend is that "all sources of carbon considered, including deforestation, total global CO2 emissions are set to continue increasing." The encouraging fall in emissions is remarkable because "it is the first annual reduction since the COVID pandemic, when emissions dropped by an estimated 5% or so, Le Quéré says."

Researchers also measured a small decrease in emissions after the 2008 recession. “However, in both cases, emissions rebounded the year after." 

"If oil prices return to their prewar levels, Le Quéré + her colleagues expect to see emissions rise once more." But the “rebound” could + should be countered by further [addition of] renewable energy to the world’s portfolios. But these researchers have quantitatively established that "to tackle climate change + guarantee that global fossil emissions decrease durably, the expansion of renewable energy + electric vehicles needs to accelerate further,"

I would not just support + second this declaration—if this were a poker game—I would be all in.


r/EnergyAndPower • • 15h ago

Wood Mackenzie puts the 2025 US power transformer supply deficit at 30% and says imports are about 80% of supply. How should planners treat a 128-week lead time in a project schedule?

Post image
2 Upvotes

Ive been reading Wood Mackenzie's transformer numbers and the import share is what stuck with me. their Aug 2025 release puts the US supply shortage in 2025 at 30% for power transformers and 10% for distribution, and estimates imports at about 80% of power transformer supply (50% for distribution). the Sept 2025 report with American Clean Power has average power transformer lead time at 128 weeks in Q2 2025, after easing by 10 weeks, and says power transformers and generator step-up units are seeing sustained lead times of 2 to 3 years.

what that does to a schedule: in impact assessment work you build the programme backwards from permits and construction, and the transformer was always a line item that quietly showed up on time. at 2 to 3 years it's the critical path. a plant can be built, tested and permitted and still be waiting on a factory slot, and the slot belongs to whoever ordered earliest, which is a funny thing to discover in month 30..

what i can't tell from the headline numbers is how much of the 128 weeks is standard-design manufacturing versus custom engineering, and how much of the 30% is real missing capacity versus developers reserving slots for projects that may never get built. the 30% is a supply gap estimate, not a count of units. wood mac also says OEMs have announced about $1.8bn of North American capacity since 2023, which helps, but it won't land in a 2027 schedule.

so for people who actually schedule these: when do you place the transformer order, at financial close, at permit, or earlier? and would you pay for a slot reservation before the project is certain?

sources:
https://www.woodmac.com/press-releases/power-transformers-and-distribution-transformers-will-face-supply-deficits-of-30-and-10-in-2025/
https://www.powermag.com/wp-content/uploads/2026/01/making-the-connection-executive-summary-september-2025.pdf
https://www.powermag.com/transformers-in-2026-shortage-scramble-or-self-inflicted-crisis/


r/EnergyAndPower • • 1h ago

UNION OF USA DECLARING A NATIONALEMERGENCYTO SECURETHE UNITED STATES BULK-POWER SYSTEM

1 Upvotes

After this executive order, how can a foreign-controlled electrical equipment company avoid sanctions, participate in U.S. grid bidding, design its corporate equity structure, and meet qualification requirements?