A question megathread will be stickied to the top of our subreddit every Tuesday to catch all of your questions, big or small.
Do you have a question about the Underground, or maybe even the greater London network? Ask it here and our knowledgeable community will endeavour to answer it. Last week's iteration can be found here.
Please note that going forward, all questions posted outside of this thread will be moderated away/deleted.
If the lifts at Covent Garden are out, this is your way up: an emergency spiral staircase of 193 steps. It's one of the few central London stations where the platforms can only be reached by lift or stairs, no escalators.
And you could walk instead: Leicester Square is only about 260 metres away, the shortest distance between two adjacent stations on the whole network.
The name, by the way, has nothing to do with "covenant". "Covent" is an old form of "convent": this was the garden of the Abbot and convent of Westminster Abbey.
Photo: RichardAsh1981, CC BY-SA 2.0, Wikimedia Commons.
A few years ago I created my own version of the Rail and Tube services map, with river services, individual tram & DLR routes and step free access info for all stations included, as well as other things, covering the wider metropolitan area. Here's the update for 2027.
The biggest changes for the 2027 version is to West London and the Lea Valley/Docklands. There's also some updates to rail and tube stations with step free access and some other minor detail changes.
The sub surface line has AC, the Piccadilly line is also getting something that’s close to AC. How come TFL doesn’t run the AC in reverse for heating in winter? This would a) use less energy b) cool down the tunnels slightly to make the summer ride more bearable.
The figure is based on the famous map of the London Underground designed by Harry Beck in 1931. Despite the initial resistance it faced due to the strong degree of abstraction in its design, which does not literally correspond to the actual geographical layout of the network, it is now used as a basic model for designing almost all subway networks around the world.
The map focuses on improving readability by using colored lines that intersect at angles of 45 and 90 degrees.
Which cartographic aspect makes the map presented a reference for other subway networks?
You are given 2 stations and have to navigate from one to the other using only underground and overground lines. Finding the route with the least changes, then stops will get you the most points.
Another Platform to Street exploration — this time at Hampstead on the Northern line.
And this station has quite a few surprises.
First, Hampstead holds the record for the deepest platforms on the London Underground, approximately 58.5 metres (192 feet) below street level.
That’s a long way down!
The station opened on 22 June 1907 as part of the Charing Cross, Euston and Hampstead Railway.
But here’s something interesting.
Although it opened as Hampstead, the station was originally planned to be called Heath Street.
And if you look carefully at the platform walls, the name HEATH STREET is still there, picked out in the original-style burgundy and cream tiling.
I love little historical details like this.
There’s also one of Mark Wallinger’s Labyrinth artworks on the platform, numbered 180/270, part of the collection installed across the Underground to mark its 150th anniversary in 2013.
Then there’s the staircase.
Over 320 steps!
The emergency staircase winds around a central shaft, with some remarkable views of the spiral construction, ironwork and curved tiled walls.
I actually climbed it (I thought it was 311 steps), and it’s quite an experience. Not something I’d be rushing to repeat!
Near the ticket hall there’s also a fascinating collection of historical photographs showing the construction and early years of the station, including its opening in June 1907.
And finally, emerging onto Hampstead High Street, there’s that magnificent red-tiled Edwardian station building designed by Leslie Green. Opposite the station are also some historic building gems as well.
It’s one of those stations where the journey from platform to street is almost as interesting as the destination.
I’m curious — how many people have noticed the old HEATH STREET lettering? And has anyone else explored the history of Hampstead’s extraordinary staircase?
If strike action goes ahead, Piccadilly line journeys should be completed by 10:30 on Friday 20 November. After this, services will start to reduce, with no service expected from midday until the evening on Saturday 21 November, including during Friday Night Tube.
There will also be no service on the District line between Earl's Court and Richmond/Ealing Broadway from midday on Friday until Saturday evening, as these parts of the line share infrastructure with the Piccadilly line.
Normal Night Tube service is expected to run on Saturday night.
I'd love to get people's thoughts on my latest design (PDF here) before I make my first long-form video on what I think the main problems are with the current TfL London Tube map and how to fix them.
My main aims were:
to stay as faithful as possible to the modern "Beck" design and keep it recognisably TfL, whilst allowing for small design grammar/rule changes that ensure the extent and complexity of the London network can be better depicted. Such as....
to show the National Rail services truthfully - rather than either
just blanket operator routes (Southern, Southeastern etc) that are depicted as big complicated sections of blue or green in the map that render it useless.
nothing at all, which makes south london look barren, which it obviously isn't.
On my map, National Rail is broken down into London metro services (which are given their own colour and identity) and thin medium-fast commuter services, which are 0.25x the thickness of the normal lines (see the red regional rail lines on the Berlin BVG map).
to distinguish between non-tube TfL modes, rather than having everything that's not the Tube be double parallel lines. London Overground remains double parallel lines, the light rail (DLR and Tram) become triple parallel lines. And...
to give the Elizabeth line visual priority on the map as it's a high capacity main line running through the heart of the city. The line thickness is 1.5x that of the other lines to make it stand out more (see RER lines on the Paris map).
to refine clarity that the current design (and certainly the Rail and Tube map) seem to be lacking in my opinion. It sometimes feels like the National Rail lines, and even the Elizabeth line, are a bit of an afterthought the way the bend and curve unnecessarily. See: Southeastern south of Cannon Street, Elizabeth line that curves up to Farringdon, the Weaver line Chingford branch, North West railway round Queen's Park.
This map is still a work in progress. I think the thin commuter lines are probably the weakest element of the design. They feel slightly squiggly and hard to follow. They should be in the background as they aren't as important as the rest of the London lines, but still should be able to be followed easily by a user.
I've not included accessibility information on this map. (The TfL Rail & Tube map doesn't have it either). I think having station blobs show that information massively overcomplicates it otherwise and makes the centre really clunky (Liverpool Street/Moorgate being a prime example). The black & white blobs for interchanges and ticks for normal stations is really clean and has a timeless look. The other option could be to include the information next to the station name (like Berlin), but for interchange stations where one set of platforms are fully step-free, and some aren't, I'd have to start using different colours to mean different things and that could get messy.
The immediate requirement under the framework is to support the Piccadilly Line Upgrade through the removal, decommissioning/scrapping, recycling and disposal of the 1973 Tube Stock fleet as the new 2024 Tube Stock trains are introduced. Removal and scrapping activities are anticipated to commence in spring 2027 and conclude during 2028.
The current Piccadilly line has very little extra trains which means any trains sent to scrap within this period will be replaced by 2024 stock.
TfL anticipates delivering several projects through the rolling stock disposal framework including Piccadilly Line 73TS rolling stock, Bakerloo Line 72TS rolling stock and Heavy Haulage Vehicles.
I keep hearing things about what's going on with Crossrail 2, and even if the project might not be built in my lifetime (and I'm only in my 20s), I couldn't help but look at the map, and I'm curious about some things on it and how it would work.
On the southern end, as much as I think the branches to Shepperton, Hampton Court, Chessington, and Epsom should be transferred to something TFL related, I do wonder if 4 branches in the southern section would be too much, and prevent an uptick of frequency. All of those branches only get 2 trains per hour currently, which is pretty miserable for outer London suburbs, and that would need to increase with this project. But the Elizabeth Line is 16 tph off peak, so if that's 4tph per branch, that could be doable, but unlike the Lizzie Line, those sections I believe would mostly still share track with existing SW lcoal services such as the Kingston Loop or the slow Woking trains. So that is something to think of. There's also Clapham Junction, which has always been a mess. The project suggests it could be a deep level station, but trying to change anything around that station is going to be a mess. Especially as those lines won't run into Waterloo anymore, so that could increase changes there too, although depends where the journeys end up.
Central Section I think is fine, a station at Chelsea is long since needed, and I think Euston St Pancras is going to be a very helpful and much needed mega interchange. Curious though about how Dalston will fit in with the two existing stations there though.
But then there's the Northern Section, which I don't know about. The line to New Southgate I think is decent, the equivalent of the Abbey Wood branch for this, and it does connect up a lot of lines together, namely the Piccadilly, Victoria, and the Great Northern line at Alexandra Palace. Handy for the connections I suppose. But the eastern bit I think is a bit of a mess. The line is severed from Liverpool Street and Hackney, and yeah there would still be Greater Anglia trains from Tottenham Hale, so wouldn't be too much of a loss, but it would need to share track with them for a very long part of the journey, more than the Liz Line's western end does. Especially as the stations on that line are not served very uniformly (Meridian Water is only on a shuttle off peak, whilst the other stations are either served on Bishop Stortford of Hertford East trains). Speaking of Hertford East, surely it would make sense for Crossrail 2 to take it over? Unless you make the line a shuttle from Broxbourne, which I think would just be a really bad idea.
The difference between the route for this and Crossrail 1 is that a) The Liz Line serves the original termini with new stations, whereas Crossrail 2 doesn't do that at either end. And b) on both national rail sections, it shares a lot of track with existing National Rail services on just double track parts (the Liz Line only really does that at Heathrow with the Heathrow Express, rest is fairly isolated from the main lines), meaning there's going to have to be a lot of timetable juggling. It feels like a good line, but I can see why the budget is nearly double that of Crossrail 1, and that's still just the planning stage.
What does everyone think of this and can it be improved further?
You know how common jubilee terminators are wilesden green West Hampstead Stanmore or Wembley Park also North Greenwich. All of them have sidings. North Green a reverser and 4 sidings. Yesterday I went onto a jubilee terminating at Canary Wharf and board said startford 2 minutes startford 4 minutes Stratford 8 minutes. Jubilee has to be the 90s line but it’s gone downhill over the years.
Due to planned engineering works, there’s no service from Euston and Charing Cross to Morden via Bank. All southbound trains from Edgware are terminating Euston while All southbound trains from High Barnet are terminating at Charing Cross. So I just managed to catch a Northern Line train terminating at Euston. This is one of the rare terminators on the Northern Line, with only two or three rarer ones coming to my mind.