r/PCB • • 4h ago

ESP & MSP sensor board Revision III request

Thumbnail
gallery
10 Upvotes

This is my first ARM 2 layer board, designed to control sensors and transfer data wirelessly. Please review my board, and if I’ve made any mistakes,

I’d really appreciate your guidance. It's drawn on the Kicad.

I've forgot to share schematics on this review, it is available on REV II request below. There have been no changes since then. I'm sorry for this.

Rev I request

Rev II request


r/PCB • • 1d ago

Semiconductor Probe cards

Thumbnail
gallery
326 Upvotes

I posted this on Facebook and a lot of people were interested I thought you guys might appreciate this, they are cantilever probe cards..I design and make these, they are used to test silicon wafers, and bare die prior to packaging, the needles you see are sub 10 micron diameter.

We can achieve probe placement accuracy around 5 microns, and pitch of around 40 microns


r/PCB • • 1h ago

[First post] Hi guys, here's my first design for my pcb (at least the schematic for it). Is it too bad? I do see a lot of overlap in the main board so I was wondering if I did too much. Any good general pointers/"rule-of-thumb"-s?

2 Upvotes
main board
secondary screen and button board

r/PCB • • 1h ago

[Review Request] Casio F91W NFC Watch PCB

Thumbnail
gallery
2 Upvotes

Hello all,

I'm the same person who made this post https://www.reddit.com/r/PCB/comments/1w83s53/pcb_review_request_custom_casio_f91w_pcb_mod/ 2 months ago where I asked a review request for my old design and you guys gave a lot of useful feedback and I've made an update to my PCB with more features. The NFC chip allows me to sync steps tracked on my watch to my phone.

Changes made:- I've added more test points for debugging, a 32KHz crystal for internal RTC, an inductor for the buzzer, made the decoupling capacitors closer to the power inputs (except for the cap C3 which I couldn't get near the battery VCC terminals), an NFC chip and tried to make the routing clearer especially for the segment LCD display.

PCB details:-

i) STM32U073CCU6 MCU

ii) LSM6DSOQTR 6 axis IMU

iii) LCD zebra connector

iv) Programming pads at the bottom side of the PCB so I can program and prototype while watch module is assembled

v) 3 pushers

vi) 1 Buzzer spring contact

vii) 1 Emerald colour side mounted LED

viii) M24LR64E NFC chip

Also thanks in advance for any help!


r/PCB • • 23h ago

My first PCB also first homemade :)

Thumbnail
gallery
72 Upvotes

This is my first prototype of a PCB made for the purpose of trying to learn and workout the kinks of A. Designing one for the first time never having touched kicad but having a good amount of circuit knowledge and experience B. Actually manufacturing the boards in house from start to finish.

This was about a month ISH long process (mostly cause I took a break mid way for a bit. Took me several tries to work out the process that works best for me and the equipment I have available however I did manage to make it work. I used a table top CNC machine to cut out the 2mm thick copper cladded boards and drill the holes. Second I sent the boards through a UV laser to etch away the copper to make the traces. After the board was prepared I layered a coat of solder mask and cured it followed by another pass on the laser to remove the solder mask on the pads I needed to be exposed. After both sides were masked I soldered the parts and pads (note the soldering is terrible as I didn't make the pads big enough and realized it was very hard to get it to stick I'm already aware it's terrible T-T). Finally hooking it up to voltage I had a working prototype and proof of concept.

I plan to work out some of the problems I encountered and smooth line the process but any tips or tricks that may help me would be greatly appreciated. Im gonna try to get a cleaner finish on the mask on the next one I do and I also need to figure out how to get a good silk screen

I have learned a lot so far and hope to learn more :)


r/PCB • • 1h ago

Help! I really need help - first pcb design

0 Upvotes

I am working on a PCB project (it is not a personal project, it is more like a product I need to deliver). Ideally, I thought it would be easy to learn the skill and take on the challenge. I am an EE student, by the way. This seems to be just another era for me, though. I know the whole process: schematic, define the board layout, set design rules, place components, route traces, add a ground plane, run the Design Rule Check, inspect the 3D viewer, then generate the manufacturing files. But I need someone to walk me through all of this. Are there any resources you guys would recommend? Or is anyone willing to give me a short tutorial? Even a message would be appreciated. Also, I started working on the schematic, but it is becoming so overwhelming.


r/PCB • • 54m ago

Fable 5.2 vs PCB routing and placing

Thumbnail
pcbjam.com
0 Upvotes

I worked on a blogpost last week. Recently all frontier model providers tell us that their most recent model can route a PCB. I wanted to know if the AI hype is real or not.

tl;dr:

It is decent. It is much better if you give it tools, or if you build and reuse the tools it asks for. It is still not a human, if the board is too dense, it will give up. BUT, it can consider things like if USB in this speed needs length matching or not.

Any feedback is welcomed! I started to run a new test with Fable, Astra and Haiku with the same boards, same tools, same prompts, stay tuned!


r/PCB • • 7h ago

[Review Request] TPS65251-1 triple buck for a robot controller HAT: 3S LiPo → 5 V / 3.3 V / 1.8 V

Post image
1 Upvotes

Hi all, I'm a student working on my first more complex board and would appreciate a review of the power stage.

**Context**
Robot controller board in Raspberry Pi 4 HAT format: RP2350B MCU, 4 small DC motors (drivers run directly from the battery, not shown), 4 VL53L8CX ToF sensors and a Pi 4 with a LiDAR. Schematic drawn in KiCad.

**What the circuit should do**
- Input: 3S LiPo (+BATT, 9.6–12.6 V). Fuse and reverse polarity protection are on another sheet.
- IC: TI TPS65251-1, switching at 1 MHz (ROSC = 174 k), SYNC tied to GND, LOW_P pulled low (forced PWM, MCU can switch to PFM in standby).
- Buck 1: 5.18 V / up to 3 A → back-powers the Pi 4 through the GPIO header (ideal diode on another sheet). EN1 is driven by an MCU GPIO with a 100 k pulldown, so the Pi is optional and only powered when needed.
- Buck 2: 3.3 V / ~1.5 A → MCU, sensors, logic.
- Buck 3: 1.8 V / ~1 A → VL53L8CX core/IO and level shifters.
- EN2 + EN3 come from a divider on +BATT (100 k / 21.5 k) → on at ~9.4 V, off at ~6.2 V. This is only a coarse UVLO. The real low-battery cutoff is done in firmware via ADC.
- PGOOD has a 10 k pull-up to 3.3 V (pin is 3.6 V abs max) and goes to an MCU GPIO.

**Design values**
- Inductors: 3.3 µH (Buck 1), 4.7 µH (Buck 2/3)
- Output caps: 2 × 22 µF ceramic per rail
- Current limit: RLIM 75 k / 150 k / 200 k
- Soft-start: 10 nF (Buck 1), 4.7 nF (Buck 2/3)
- Compensation: Type II, crossover ≈ 60 kHz, assuming ~25–35 µF effective output capacitance after DC bias derating. Footprints for Cff and C_roll are placed but DNP.

**Questions**

  1. Are the compensation values reasonable at 1 MHz, or should I go straight to Type III (populate Cff)?
  2. Is using the EN divider as a coarse UVLO acceptable, given the large EN hysteresis (1.67 V / 1.10 V)?
  3. Buck 1 current limit margin: with RLIM = 75 k the minimum limit is ~3.65 A vs. 3.46 A peak inductor current at full 3 A load. Real load is ~2.3 A. Acceptable?
  4. Anything else I missed?

r/PCB • • 8h ago

[Review Request] ADF4351 Synthesizer Board (Student Project)

Thumbnail gallery
0 Upvotes

Hello guys,
This is actually my first serious PCB design project. It’s a student project based on Analog Devices' ADF4351 synthesizer IC. The target frequency is 2.2 to 2.7 GHz with a 5 MHz frequency step. As shown in the uploaded images, I used two USB 2.0 Type-B connectors for both data and power inputs, along with two 0-ohm resistors in case I decide to use only one of them. The upper section is for the synthesizer, and the lower section is for the microcontroller. The MCU I used is an STM32F103C8T6 with an 8 MHz crystal. I also included two pin headers: one for the ST-Link dongle connection and the other for boot mode. Additionally, I added a CH340N for USB-to-UART. I'm not sure if this was strictly necessary, but someone with a lot of microcontroller experience told me it can make programming and debugging easier. I have three regulators: one for the ADF4351 power pins, another for the ADF4351 VCO cores and RF outputs (since they're open-collector), and a third for the digital section. The SMA connector on the right is for an external reference input with a 0-ohm resistor in front of it, though I also included an onboard local oscillator. The attenuator is a digital step attenuator, and the amplifier is a 5V-fed GVA-84+ and the RF tracks are GCPW.
This is my first PCB, and any feedback would be greatly appreciated!


r/PCB • • 9h ago

How to Choose a Standard PCB Manufacturer: An OEM Buyer’s Checklist

Post image
1 Upvotes

 Choose a standard PCB manufacturer by matching its capabilities to your approved design, confirming inspection and testing requirements, reviewing engineering support, and comparing complete quotations. Before placing an order, agree on materials, production responsibilities, delivery milestones, and how changes will be approved.

For an original equipment manufacturer, or OEM, PCB supplier selection affects several stages of product development. The same supplier may support an initial engineering build, a pilot production run, and regular orders after the product launches.

A useful evaluation therefore needs to answer a practical question: Can this manufacturer consistently deliver the board you specified, with the documentation and support your production team needs?

The following checklist helps engineering and purchasing teams assess that fit.

1. Define Exactly What You Need to Buy

Start by identifying the required deliverable. PCB fabrication, assembly, and turnkey production cover different responsibilities.

  • Bare-board fabrication: Production of the circuit board before electronic components are installed.
  • PCB assembly: Mounting and soldering components onto the board, with component sourcing responsibilities agreed separately.
  • Turnkey PCB manufacturing: A coordinated service covering board fabrication, component procurement, assembly, and other agreed activities.

When reviewing turnkey PCB manufacturing services, confirm which engineering checks, inspections, tests, and delivery arrangements are included in the quotation. Blind Buried Circuits describes fabrication, procurement, assembly, and engineering analysis within its turnkey offering. Full Turnkey PCB Services

Prepare a clear manufacturing brief

Give each prospective supplier the same information:

  • Approved part number and design revision.
  • Required quantities, including prototype and expected repeat orders.
  • Board dimensions, layer count, material requirements, thickness, and tolerances.
  • Copper requirements, surface finish, and any special manufacturing instructions.
  • Required inspections, tests, acceptance criteria, and delivery date.
  • Assembly requirements and the bill of materials, where applicable.

Provide the relevant PCB manufacturing files and documentation, including fabrication data, drill information, drawings, and assembly outputs appropriate to the project. Confirm the manufacturer’s accepted file formats before submitting the package. blindburiedcircuits.com

A clear brief gives suppliers a consistent basis for technical review and pricing.

2. Match Manufacturing Capabilities to Your Actual Design

For this checklist, “standard PCB” refers to conventional board constructions within a supplier’s normal manufacturing capabilities. Your project still needs its own defined materials, dimensions, layer count, and quality requirements.

When evaluating an OEM PCB manufacturer, ask for confirmation against your design:

  • Can the supplier meet the specified trace widths, clearances, holes, and tolerances?
  • Is the required board construction part of its routine production?
  • Can it obtain the approved laminate and surface finish?
  • Can its assembly process handle the components in your design?
  • Can it support your initial quantity and expected repeat orders?

Material selection deserves particular attention. Laminate resin systems influence electrical, thermal, and physical properties, so the material requirements should reflect the application. Ask the supplier to confirm the approved grade or agreed performance requirements and its process for proposing substitutions.

You can use Blind Buried Circuits’ standard PCB manufacturing capabilities as a starting point for discussing fabrication, assembly, design review, and production support. The final confirmation should address your specific files and requirements. Standard Printed Circuits Board California USA

Also ask:

Which production stages will your team perform, which will partners perform, and who will manage quality issues across the complete order?

This establishes responsibility throughout the manufacturing process.

3. Understand How Engineering Reviews and Changes Are Managed

A manufacturer’s engineering review is an opportunity to resolve production questions before the build begins.

Design for manufacturing, or DFM, checks whether the released design is compatible with the intended manufacturing process. Design for assembly, or DFA, addresses issues related to component placement and assembly.

PCB design-rule checks can include manufacturing constraints, but their usefulness depends on the rules configured for the project. Those rules should reflect the selected manufacturer’s capabilities. Supplier review provides another opportunity to identify mismatches before fabrication.

Ask prospective suppliers:

  • What files and features are included in the engineering review?
  • How are manufacturing questions documented?
  • Who must approve proposed changes?
  • How will an approved change appear in the production records?

For example, a question about a hole size, board outline, or material substitution should result in a documented decision.

Agree on written approval for changes that affect the released design, materials, or acceptance requirements. This gives both teams a clear reference for the build.

4. Agree on Quality Requirements and the Evidence You Will Receive

Effective PCB quality control begins with defined acceptance requirements.

Ask which standards, revisions, product classes, and project-specific requirements will apply. Several commonly referenced IPC documents address different parts of PCB production:

ReferenceMain purpose
IPC-6012Qualification and performance requirements for rigid printed boards.
IPC-A-600Guidance for interpreting observable acceptance conditions on printed boards.
IPC J-STD-001Requirements covering materials, processes, and acceptance for soldered electronic assemblies.
IPC-A-610Acceptability requirements for electronic assemblies.

IPC distinguishes these manufacturing and acceptance roles in its standards guidance. Agree on the applicable documents and revisions for the order. electronics.org

Request relevant certification documents and check their scope, facility details, and validity. Also ask for an example of the inspection or test report that would accompany your project.

Clarify inspection and testing separately

Each method provides different evidence:

  • Visual inspection and automated optical inspection: Examine observable features and assembly conditions within the inspection system’s coverage.
  • X-ray inspection: Helps examine concealed solder structures, including connections beneath certain component packages.
  • Bare-board electrical testing: Checks circuit connectivity against design data, including opens and unintended connections.
  • Functional testing: Evaluates an assembled board against defined operating requirements. Printed Circuit Board Electronics Testing

When discussing PCB electrical and functional testing, agree on the test scope, acceptance limits, required equipment, and reporting.

If functional testing is required, establish who will provide the procedure, firmware, fixtures, and operating conditions.

5. Compare Quotations on the Same Basis

A useful quotation explains what the supplier will deliver, the requirements it will meet, and the assumptions behind the price.

Use the following worksheet when comparing standard PCB manufacturing quotations:

Comparison pointWhat to confirm
DeliverableBare boards, assembled boards, or a turnkey build.
Design specificationSame approved revision, materials, finish, quantity, and tolerances.
Engineering workIncluded design review and how additional engineering changes are charged.
Production chargesUnit pricing, tooling, setup, stencils, and other applicable charges.
Inspection and testingIncluded methods, coverage, reports, and separately priced options.
DeliveryProduction schedule, shipping charges, and expected arrival date.
Changes and exceptionsApproval process for substitutions, deviations, rework, and replacement.

Illustrative example

An OEM requests 100 assembled controller boards. One quotation covers assembly using customer-supplied components. Another includes component sourcing and an agreed functional test.

The purchasing team should first align the component-supply responsibilities, test requirements, and delivery scope. It can then compare the proposals against the same project needs.

Record exclusions and conditional items before approving the purchase order. This makes the quotation a more useful reference throughout production.

6. Confirm When the Lead Time Starts

Ask the manufacturer to define the start and end of its quoted lead time.

Useful questions include:

  • Does production timing begin after file approval, engineering clearance, or material availability?
  • Are component procurement and testing included?
  • Does the quoted date refer to shipment or delivery?
  • Who will communicate delays or unresolved questions?
  • What happens to the schedule if the design changes?

These questions help engineering, purchasing, and production teams work from the same schedule.

For repeat orders, discuss expected demand, component availability, and how far in advance orders should be released. Establish a named contact for engineering questions and another for order status if those responsibilities are handled separately.

7. Use the First Build to Confirm the Working Process

A prototype or pilot order gives the OEM an opportunity to assess the delivered boards and the supplier’s handling of the project.

Agree on the approval criteria before the build begins. Depending on the order, the review may cover:

  • Correct part number and revision.
  • Board dimensions and mechanical fit.
  • Specified materials and components.
  • Workmanship against the agreed acceptance requirements.
  • Required electrical or functional test results.
  • Closure of documented deviations.

Ask how findings will be recorded and resolved before the next production stage.

The first build also reveals practical details: whether questions were raised clearly, whether changes were approved correctly, and whether the delivered documentation matches the order.

Use that evidence to decide what needs to be confirmed before increasing quantities.

8. Plan for Consistency Across Repeat Orders

Long-term supplier evaluation should include how the manufacturer controls changes between production batches.

Ask how it will:

  • Maintain the approved design and bill-of-materials revision.
  • Identify production batches and retain relevant records.
  • Propose material or component substitutions.
  • Communicate component availability or lifecycle changes.
  • Record corrective actions and apply agreed improvements.

For products expected to remain in production, request a clear process for reviewing changes before implementation.

A repeat order should reference an approved manufacturing package and any agreed updates. This gives both the OEM and the supplier a consistent basis for production.

Frequently Asked Questions

What should I check first when choosing a standard PCB manufacturer?

Start with the required deliverable and approved design specifications. Confirm that the manufacturer can meet the board construction, materials, assembly needs, testing requirements, quantities, and delivery expectations before comparing quotations.

Can standard PCB manufacturing include multilayer boards?

Yes. The term can cover conventional single-sided, double-sided, and multilayer constructions. Confirm the supplier’s supported layer counts, materials, and manufacturing limits for your project. Blind Buried Circuits lists these configurations on its standard PCB service page. blindburiedcircuits.com

What files are needed for a PCB quotation?

Requirements depend on the service. Fabrication typically needs board manufacturing data, drill information, and relevant specifications. Assembly also requires a bill of materials and appropriate placement or assembly documentation. Confirm accepted formats and identify the approved revision. blindburiedcircuits.com

How can an OEM evaluate PCB manufacturing quality?

Request evidence tied to the proposed build: applicable quality requirements, relevant certifications, engineering-review procedures, inspection plans, test reports, and first-build acceptance records. Agree on what will be supplied with the order.

Should a PCB supplier support both prototypes and production?

That depends on the purchasing strategy. If the same supplier will support both stages, discuss production quantities, sourcing arrangements, repeat-order controls, and expected documentation during the initial evaluation.

Prepare Your Next PCB Manufacturing Request

Before approaching suppliers, bring together the approved files, quantities, material requirements, inspection and testing needs, and delivery expectations.

To discuss a project with Blind Buried Circuits, submit your PCB requirements for a quotation. Ask the team to confirm the manufacturing scope, engineering questions, included quality checks, and delivery assumptions against your project package. Blind Buried Circuits

 


r/PCB • • 1d ago

Need a little review help form the pcb gods pls.

Thumbnail
gallery
32 Upvotes

Hey so i have a little new project goin on, WSNES „SNES-LoROM-Flashcart with WLAN-Upload for Homebrew and development on real native Hardware.“

I had some local agents, where i coded some skills to check the parts and connections for errors, but they dont have any idea about how good routing looks and so do I.

I need a little review on how shitty my routing is, i know it is cause i have no engeneering degree what so ever and thought everything my self. Which isnt a bad thing, but i know that i dont know enaugh so thats why i ask u People here.

For more information, its also a public repo on github Github WSNES


r/PCB • • 10h ago

Should i buy real or clone Arduino

Thumbnail reddit.com
1 Upvotes

r/PCB • • 20h ago

[Review Request] custom fpc cable adapting display for waveshare lcd driver board

Thumbnail
gallery
4 Upvotes

I recently posted a board here and got a lot of constructive criticism (Thank you everyone who contributed!) I realized I’m likely too far out of my depth, so I scaled back.

I found this Waveshare esp lcd driver board that does 90% of what I want, the issue is the LCD pinout. I can’t find any 5” screen that matches the pinout. I figured maybe a full pcb might be too complex, but I’d try my hand at a custom ribbon cable to adapt an LCD for the board.

The LCD I own and want to use is the ER-TFT050-9. It uses a 40-pin, 0.5 mm-pitch ribbons, same as the board but their pinouts differ, so the adapter rearranges the signals.

First time routing a cable so let me know if I’m doing anything stupid.

My biggest question mark with this setup:
The Waveshare board exposes five connected red bits, six green bits, and five connected blue bits. I’ve mapped those to the display’s upper RGB inputs and tied the unused lower inputs to ground: R0–R2, G0–G1, and B0–B2. The idea is to use the available signals as the more significant bits and hold the remaining inputs at a defined logic level, giving a zero-filled 5/6/5-bit color value.

I haven’t confirmed from the panel’s initialization and ST7701S interface configuration that this particular display accepts that mapping. Is tying the lower inputs low appropriate for its configured RGB mode, or should they be connected differently? Or will this just not work at all?


r/PCB • • 12h ago

Making an f-91w smartwatch mod, need advice on circuit design

Thumbnail
reddit.com
1 Upvotes

r/PCB • • 15h ago

Anyone here actually used OSM or SMARC modules in production?

Thumbnail reddit.com
1 Upvotes

r/PCB • • 15h ago

Please Review My PCB for a Daisy Seed based Audio FX Unit

0 Upvotes

Split between Digital and Analog Grounds. OLED SPI and VCC lines pass through the GNDA region, is this ok? Anything I've missed?


r/PCB • • 3h ago

I spent $200 trying flux.ai today, and it didn’t even finish half the PCB. Is this reasonable?

Post image
0 Upvotes

Today I tried an ESP32-S31 e-paper screen PCB layout project on flux.ai. I’ve spent $200 and I’m not even halfway done. How much is this going to cost me in total to lay out a small 4-layer PCB?

I’ve been waiting for ages, and your AI still hasn’t finished the PCB. Honestly, I’m pretty disappointed. I don’t know what to do next. Should I top up more credits, only to hit the limit again?

Is this normal? Has anyone else run into this kind of issue?


r/PCB • • 16h ago

Out of the box circuit ideas to get a low voltage singal across 1000ft?

Thumbnail reddit.com
1 Upvotes

r/PCB • • 20h ago

[Review request] Modular Macro pad Hub Revized

Thumbnail gallery
2 Upvotes

Any feedback appreciated :)


r/PCB • • 9h ago

Newer Rules. Twin iCE40UP5K board, GPU-free / RAM-free — design intent, not finished

Post image
0 Upvotes

r/PCB • • 12h ago

How do you keep a small dev board from moving when you unplug USB?

Post image
0 Upvotes

r/PCB • • 1d ago

Please help me identify the rating of this fusible resistor.

Post image
2 Upvotes

r/PCB • • 1d ago

Can power circuits next to each share capacitors ?

5 Upvotes

Case 1:

A buck converter supplies a 5 V rail, and a nearby LDO converts it to 3.3 V.

Case 2:

A power multiplexer supplies VBUS, and a nearby LDO is powered from that rail.

In both cases, the two devices are placed about 1 cm apart or less, connected by a wide trace or copper pour.

Can the upstream device’s output capacitors also serve as the LDO’s input capacitors?

Should I keep using the capacitor values calculated from each device’s datasheet ?

especially, if those values bring the total capacitance on the shared rail above a limit specified in either datasheet, should I reduce some of the capacitor values or even remove one or more capacitors?

This is something I’ve been struggling with for a long time, I tried to find an answer from data sheet, but all explanations there are unclear.

So I'd really appreciate it if someone could explain this or share some experience.

Or, if it’s too complicated to explain here, I’d also appreciate any articles or videos that cover this topic.


r/PCB • • 23h ago

[Review Request] ESP32 timing gate – 2-layer board with Li-ion charging, fuel gauge and USB-C

1 Upvotes

Hi everyone,

I'm a high school EE student and this is my final-year project: a pair of wireless timing gates for measuring a runner's speed. Two identical boards (start + finish) talk to each other over ESP-NOW and send results to an Android app. This is my first board of this complexity, so I'd really appreciate a review before I order it.

**Main parts:**

- MCU: ESP32-WROOM-32

- Charging: BQ24074 (USB-C input, NTC on the TS pin)

- Battery: single 18650 cell, DW01A + 2× AO3400A protection

- Fuel gauge: MAX17048

- 3.3 V regulator with 1 µH inductor (Taiyo Yuden NRS3015)

- USB-UART: CH340C with auto-reset (2× S8050)

- ESD: USBLC6-2SC6 on USB, SOD-523 TVS diodes on external connectors

- Peripherals: ToF sensor (6-pin header), I²C OLED, magnetic buzzer, RGB status LEDs

**Board:** 2 layers, 1.6 mm, ~XX × XX mm, both layers poured with GND, manufactured at JLCPCB. Silkscreen intentionally left out.

**What I'm most unsure about:**

  1. Layout of the regulator and charger section (loop area, cap placement)
  2. Ground plane continuity on the bottom layer and stitching vias
  3. Antenna placement / keepout around the ESP32
  4. USB D+/D− routing from USB-C to the CH340C

Schematic (PDF) and images of each layer are attached. Any feedback is welcome, even small things. Thanks!