TL;DR: 18 years building iOS apps, first time vibe-coding with Claude Code. I shipped two apps. The first passes were amazing, but getting each one to production still took weeks of testing and fixing. Lessons below, and marketing advice would be greatly appreciated!
I've been building mobile apps for 18 years (solo and on large teams, as an engineer/manager/director). Here's my first vibe-coding experience, which turned into two iOS apps.
App 1: Ratings Now!: Point your camera at a wall of movie and show titles, or say a title, and get its rating.
I'm on the Claude Max $100 plan with Claude Code. I gave Fable my idea in moderate detail and it made such an impressive first pass on the UI that I thought I'd be done in a week. Two months and 346 commits later (part-time), I finally released it.
The UI was good, but the initial scan was abysmal. OCR plus matching to movie and TV titles turned out to be really hard, and I almost gave up. It felt like whack-a-mole until Fable built a test harness of ~70 real photos (TVs, posters, streaming menus) with hand-checked titles, so every change was scored against all of them instead of me eyeballing one screen at a time.
Why so hard? I wanted low cost and privacy: no server, no expensive AI, no images leaving the phone. Everything runs locally with Apple's text recognition plus a ton of matching logic. I didn't find a small local LLM that could reliably recognize titles from posters.
Takeaways:
- You still need a solid developer to productionize a complex app
- Even Fable needs a lot of direction, though it surprised me many times
- You still need lots of good test/debug iterations
- Test harnesses with real examples are invaluable
App 2: Watch Jam: Vote on what to watch with friends, your partner, or solo, and discover great movies and shows you'd never have heard of.
This time I did some things differently:
- Did the data plumbing first and researched Firebase Realtime DB
- Had Fable pull common pieces of my first app into an "app launchpad" project
- Spent a day with Claude Design on the UI
- Told Fable to build the app on the launchpad with that design
The first pass was INCREDIBLE (usable and beautiful). But getting to production still took a lot of testing and fixing. The coolest part: Fable wrote a comprehensive test plan, then I unleashed several Opus agents on four simulators at once (two iPhones, two iPads; one hosted, the others joined). I told them to only report bugs, not fix them. After ~8 hours: 36 rooms, 38 failures, no crashes, including nuanced bugs like a button that did nothing on one device size and a filter that never synced to joiners. Opus 5.5 then fixed everything with some product guidance from me. From first commit to App Store: seven weeks, ~230 commits, ~330 unit tests.
I also let Fable make the screenshots and videos and prep the submission via the App Store Connect API. Highly recommend!
New takeaways:
- An app launchpad + Claude Design gave a much better first pass
- Agents running a test plan in simulators make a great bug-bash without a team
- Productionizing is still incredibly hard, and the more you test the more you find
Marketing and pricing (advice welcome!): Launching solo in today's App Store is way tougher than it used to be. Both apps are free to try with optional one-time unlocks (no ads or subscriptions). I keep debating whether to switch the paywalls off until they get traction. Are Apple Search Ads or small influencers worth it for a brand-new indie app, and what budget did you set? I'd love to hear what worked for you.
And honest feedback on the apps themselves: would you use either one? What would make you try it?
P.S. Happy to send a free unlock code for either app if you'd like to try them, just DM me.