r/estimators • • Oct 22 '21 Bravo

Looking to hire an estimator? Are you an estimator looking to make a move? Post here!

120 Upvotes

r/estimators • • 7h ago

What's your Claude Bluebeam experience?

8 Upvotes

We got a bluebeam max trial and I've messed with the claude link a tad but I haven't found any exciting use for it yet. What's been your experience?


r/estimators • • 4h ago

Why don’t we get the original CAD files?

4 Upvotes

I’m still new to this but I feel like a big gripe I’ve seen is just how tricky it is to get every detail from a 2D rendition pdf plan. Ive been wondering if we got the original CAD file, wouldn’t we know exactly what goes where and how much of everything? Why wouldn’t we just get the source file why is the standard getting this rough copy of something and not the source of truth?


r/estimators • • 1h ago

AI take off program- division 9

0 Upvotes

Does anyone use AI for take offs or proposals? What program do you use ? Do you like it?


r/estimators • • 1d ago

Architect here, what’s one thing in a drawing set that always makes your life harder on bid day?

39 Upvotes

Trying to get better at this from my side. i know the obvious ones like incomplete sheets and late addenda, but i’m more curious about the small repeat offenders. things you see in every set that make you groan. i’d rather hear what actually costs you time than guess.


r/estimators • • 6h ago

Looking for Estimating Role

0 Upvotes

Looking for an estimating role across civil and structures concrete, masonry, flooring, and painting trades. Remote or contract-based. DM or comment if you have an opening or backlog support needs!.


r/estimators • • 17h ago

Can someone who’s sales driven do well in estimating?

6 Upvotes

I’m currently working in construction operations(PE), but I’ve always been pretty sales driven. I have a background in high ticket sales, enjoy networking, building relationships, and generating new business.

I’m considering transitioning into estimating/preconstruction because I feel like it could be a good combination of my construction experience and business development interests.

My long term goal is to eventually develop my own commercial and small multifamily projects, so I also see a lot of value in understanding construction costs, takeoffs, bidding, and the numbers behind a project.

For those already in estimating, do you think someone with a sales oriented personality could thrive in this field? Are there opportunities to combine estimating with client relationships and business development as you move up?


r/estimators • • 20h ago

whats a day in the life?

6 Upvotes

I'm considering doing this after finishing my civil engineering program. Heard it pays well. Whats a day in the life like?


r/estimators • • 1d ago

What mistake made you permanently change how you estimate?

11 Upvotes

Hi all, new here. I’ve led a team of estimators for about 3 years, mostly multifamily: apartment buildings and multi-building complexes, drywall/framing/insulation.

Early on, when it was just me and one other estimator, we bid a large apartment building for a well-established GC. We were at the table with the contract in hand when we realized we’d missed an entire wing. We had to pull the bid and resubmit. Now every takeoff gets a unit-type and unit-count check against the architectural plans before it goes out.

What’s yours? A loss or a near miss that made you add a check, change a process, or stop trusting something you used to take for granted. I’m especially interested in what you actually changed afterward.


r/estimators • • 21h ago

Field electrician moving into estimating, interview tomorrow with a big GC's industrial electrical group. What would you want me to know?

3 Upvotes

Hi all, I'd appreciate real-world advice before a Teams interview tomorrow afternoon.

My background: 10+ years in electrical (low voltage first, then commercial, and about 2.5 to 3 years on data centers). I'm a journeyman and I've led crews of up to 10. A couple of months ago I moved into estimating: takeoffs in Bluebeam and IntelliBid, vendor quotes, RFIs, and GC follow-ups, mostly commercial, healthcare, and tilt-up work. A senior estimator reviewed my labor units and direct/indirects, so I haven't built those on my own yet.

The role: electrical estimator in the industrial group of a large GC that self-performs electrical work (industrial, data center, power). It's small-to-medium estimates and scopes within larger pursuits, and the posting says field experience is considered in place of years of estimating.

My questions:

  1. What do interviewers really look for in an estimator coming from the field?
  2. What technical questions should I expect (takeoff, labor and productivity, direct vs indirect vs overhead, markup vs margin, scope gaps), and how do I answer without overclaiming?
  3. How should I talk about not having built labor, indirects, and productivity on my own yet?
  4. What would you brush up on in the next 24 hours?
  5. What mistakes do new estimators commonly make that I should show I'm aware of?
  6. What should I ask them to find out whether the team will train me well?
  7. Any advice on the pay question when I'm new to estimating but experienced in the field?
  8. Where can I learn P&IDs and industrial scope quickly?

I'm open to blunt feedback. Thanks in advance.


r/estimators • • 1d ago

Bidding on Construction cleaning

4 Upvotes

We focus on construction clean up in the Washington DC area. What type of bidding software we need. We are a small operation no more 3-5 employees.


r/estimators • • 1d ago

How you became an estimator with no experience

5 Upvotes

Hello all,

I was wondering how did you break into construction estimating without any construction management or construction knowledge

I have a bachelors in business administration and estimation experience in car repairs and manufacturing but not for construction

I was looking as to how i could get into the field of construction estimation

Im planning to take a construction estimation certificate program at my local community college to help land interviews

Any suggestions or advice and experience would be appreciated

Cheers,


r/estimators • • 2d ago

Learning how to become an entry level estimator?

4 Upvotes

Hi everyone,

Just reaching out to see how much experience it takes to get the swing of things. I understand not everything goes perfect and it takes time to learn things.

Have a construction background of 35 years, been on site since I was 5 with a good sense of labour/material requirements. Also have 5 years as a PM/site reviews as well as contract admin and spec review.

However, I haven’t estimated a project for bid.

With someone with my experience, how hard would it to be to get competent in the estimating field ? What would be the biggest challenges?


r/estimators • • 3d ago

Self Promotion this is a 700MB pdf plan file

44 Upvotes

smooth like butter on my shitty $400 lenovo laptop


r/estimators • • 2d ago

How do you price jobs when your rates are “experience-based” and the main contractor wants 30–40% off?

3 Upvotes

Hi all, I’m hoping estimators and contractors can share how they actually price work. I run business development for a family-owned plumbing, sanitary and gas subcontractor in Singapore, and I’m trying to move us from gut-feel pricing to something more cost-based.

How tendering works here (for non-Singapore folks)

  • The developer awards the project to a main contractor (MC). The MC then tenders out each trade, so we bid to the MC, not the owner.
  • The MC sends a breakdown (a bill of quantities, or a list of lump-sum items by floor and system). Our QS does a takeoff, and we price every line.
  • Specialist items (pumps, gas system, pipe jacking for sewer connections, etc.) we price from supplier or subcontractor quotes plus a markup.
  • After the first submission there’s usually a tender interview. The MC tells you you’re “on the high side” and hints at a budget, and you resubmit, sometimes several times. Contracts are mostly fixed-price lump sum, and variations only get paid if you have a written instruction.
  • Labour is mostly foreign workers, and the government levy on them is a big part of labour cost, often close to the wage itself.

How we price now

  • Unit rates come from my dad’s decades of experience plus a rough markup. There’s no breakdown into material and labour.
  • Subcontractor and equipment quotes get a fixed 30% markup, which we never discount. Any discount the MC asks for comes off our own plumbing and sanitary portion only.
  • We’ve never had a proper cost-per-unit database. I’ve been reviewing past jobs. Gross margins have ranged from about 1% to 50%, and discounts to MCs ranged from 5% to 19%.

What I’d love to learn

  1. How do you build unit rates bottom-up? Do you use man-hours per item (by pipe size or valve size bands), crew-based manpower planning, or both?
  2. How do you work out a true loaded labour cost per hour, and what productivity factor do you use?
  3. How do you decide your walk-away price versus your target price? How much company overhead do you load onto each job?
  4. When an MC gives a budget clue far below your cost, how do you tell a real budget from a negotiating tactic?

r/estimators • • 2d ago

How do you learn to become a better estimator when there's nobody to learn from at work?

3 Upvotes

I have a civil engineering background and around six years of combined experience across different industries, including construction, event coordination, and tech.

After moving to Canada, I struggled to find my footing professionally. In a year, I landed a collections role at one of the Big Five banks, absolutely hated it, and quit after four months. It took a toll on my confidence, and I went through a difficult period being depressed and anxious. I also have ADHD.

I eventually started taking construction-related courses and landed a job as an estimator with a local tiling contractor.

I'm now three months into the role, and I'm struggling to figure things out.

It's a very small, owner-run company. Almost everything exists in the owner's head. There are essentially two other people, no established systems, no proper processes, and no dedicated software. I'm expected to figure things out, but I don't have prior estimating experience in the Canadian construction industry or anyone experienced to learn from.

There are frequent mistakes, miscommunication, and disappointments. Even something as fundamental as proper document control is something I'm still trying to figure out.

I've tried looking for mentors, but haven't had much success.

For those who started their careers in small subcontracting companies or had to learn estimating on their own:

- Where did you go to learn the practical side of estimating?

- Are there professional communities, associations, or mentorship programs that actually help beginners?

- How do you develop proper systems for document control, drawing revisions, takeoffs, and tracking when the company doesn't have any established processes?

I want to make the most of this opportunity and become competent at what I do, but I'm struggling to figure out where to start and where to find guidance.

Any practical advice or resources would be appreciated.


r/estimators • • 3d ago

Software/Market Research Subs: what makes you actually open a bid invite instead of ignoring it?

12 Upvotes

I'm trying to understand what actually slows a build down day to day. A lot of subs say bid invites show up like spam and get ignored unless a human reaches out. When an invite does land in front of you, what makes you open it and bid, and what makes you pass even when someone reaches out?


r/estimators • • 2d ago

GC estimators: when you send out bid invites and barely anyone replies, what do you do next?

0 Upvotes

I asked subs yesterday what makes them actually open a bid invite. Now I'm asking the other side. When you send out invites and a bunch of subs never reply, what do you do next, and what does it cost you when it happens?


r/estimators • • 3d ago

Anchor bolts, imbeds, tie-downs to foundations on a ~3500sf commercial building.

3 Upvotes

I worked for a multifamily developer and we would send our structural drawings to Simpson Strong-Tie to do takeoffs and buy our hardware. They don’t do it for smaller commercial projects.

1-story commercial building, grade beams over 4’ deep, double-sill plate. 36” j bolt in beds.

Anyone know a hardware company that will do the takeoffs if you buy their product?


r/estimators • • 3d ago

Am I chasing a dream or about to screw up a great career?

2 Upvotes

For context I’m 28, work in preconstruction for a top 100 ENR GC, and I’m finishing my master’s. Great company, big projects, good money, great ESOP, coworkers I like. I’ve got a solid foundation and a good outlook if I keep moving up. I’ve just always had the itch to start my own company.

I grew up working for my grandpa in commercial painting and drywall. He has a very small company in Arkansas, and I’m in North Carolina, so taking over his business isn’t an option. I also spent time as an estimator for a large drywall contractor. I understand the business and have been around it most of my life. This is something I’ve wanted to do for a long time.

I’ve been trying to get my own painting/drywall business going on the side. Bidding jobs, reaching out to GCs, working on marketing and LinkedIn, putting together detailed proposals, checking my rates and pricing. I have solid subs ready to go and the capital to get things going. Just can’t seem to land the work. I see the need for good subs constantly in my day job, so it’s frustrating being on the other side trying to get a chance. Maybe there’s something I’m missing, but I’m getting pretty drained. My boss recently saw me working on business stuff at work. Didn’t say anything, but I know he saw it. That was a wake-up call because I don’t want to screw up a good job trying to do both.

The legacy thing matters to me, cheesy as that sounds lol. I’d love to build something my kids could have one day. I have other things I’d like to do with a profitable business too. Help my family, give back to the community, maybe set up a scholarship eventually. I don’t need to build some massive company. A decent little subcontracting firm would mean a lot to me.

Anybody been here? Do I just pour that same energy into my career and work my way through the ranks in the corporate GC world? I’ve already got a good foundation with a company I could see myself staying with. Or do I keep chasing my own thing? It’s hard to tell if I need to keep pushing or if I’m so caught up in wanting my own company that I’m overlooking a good future right in front of me. If you started a subcontracting business, what actually got you those first few jobs? I’m not quitting with nothing lined up, but I can’t keep trying to be two people either. Be honest, you won’t hurt my feelings. I want this badly, but I’m exhausted and could use some outside perspective.


r/estimators • • 4d ago

Contract addendum lost me the job.

13 Upvotes

I recently landed a small 17k project. I’m Div 7 so our scope was some rigid insulation and wrb. The GC is a client I have worked with in over the past 6+ years from when I sold fence to when I started my own business. This GC supported me and my business partner when we were just starting up and signed a 20k work agreement from us back in the day. Our business is no longer and I have been estimating with an insulation company for about 7 months now. This 17k job was not only my first project I was contracted for but was the first time my company was able to get any work from this GC. Mind you this GC is decently large and very established for years in multiple states and highly reputable. My new company is a huge corporate mess. We have a contracts management team that is at corporate headquarters and all contracts go to them. Before they even read the contract at all, they send an addendum that immediately modifies and removes boilerplate contract items… they add got cha language and attempt to modify pretty standard AIA terms. The contract that was sent by the GC was a short form
Contract as well. I used to have to redline contracts myself when I sold fence. Often time for 100k plus projects. I would send my modifications and work with the GC to make sure we are in agreement on any non-standard or ambiguous language. This situation caused the GC to have to send our addendum to legal multiple times because my company wouldn’t budge on insurance requirements and indemnification as well as work delays and various other standards clauses. While I’m all for protecting ourselves as a company, the risk we were taking by just signing this contract was minimal. My contracts team as well my management dropped the ball so badly that the GC decided to move on to another sub and canceled our contract…

I’m curious what people have to say about this because I’m flabbergasted. We just lost a potential client that could have provided half a million at minimum in solid work over the next year.


r/estimators • • 3d ago

Is there any AI Pipeline Estimation engineer

0 Upvotes

r/estimators • • 4d ago

Planswift is NOT for grading !

6 Upvotes

Hey all, I had a long argument with one of my client’s site engineers. He wanted me to prepare a land fill and cut takeoff using PlanSwift, as all his other takeoffs are prepared in PlanSwift and he is comfortable using PlanSwift files to review them.

In my opinion, doing grading in PlanSwift is unprofessional and inaccurate. There is specific software for grading that can actually record contours and give accurate values.

Is anyone here using PlanSwift for grading? And if you are using a proper grading tool or software, kindly recommend something good.


r/estimators • • 5d ago

I added tower cranes to my OST visualizer (started as a joke, turned out useful)

Thumbnail
gallery
21 Upvotes

A while ago I started sharing a tool I built that mirrors my OST takeoff in a live 3D view. The latest addition is tower cranes.

It started as a joke. My boss wanted to show our customers where the tower crane would be placed on a project. It sounded silly, but it turned out to be really useful.

You can configure the crane mast, jib, counterjib, trolley, hook height and crane model. On both the estimating and project management sides we have to account for tower cranes. Until now we marked everything up in Bluebeam: the crane's coverage area, footing positions and other notes. With the 3D model we can now see the dimensions clearly.

In the screenshot:

Left: the tower cranes in the 3D view

Right: the rotated footings in the takeoff view

Middle: the Edit Condition Properties dialog. The crane is configured in the Notes field, e.g. [crane mast=10 jib=15 counterjib=5 trolley=60% hookheight=40ft model=liebherr]

I used the Notes field because OST stops working with the database if I add extra tables or columns.

This keeps everything fully compatible with OST.
My favorite part is watching the crane update in real time as I move the footings in the takeoff view. It might look silly, but it's amazing to see.

At this point the visualizer has about 95% of the OST features we use day to day. I also added an MCP integration, so Claude or ChatGPT can already do area takeoffs without Computer Use.

Curious what estimators think:

Would a tower crane view like this be useful in your workflow, whether for estimating, bid presentations or project planning? Or is it just a gimmick?

If you'd want anything else on the 3D side (staging areas, equipment, cut/fill), I'd love to hear it.