r/Contractor • • 16h ago

Looking for dumpster company

1 Upvotes

Hi I am a contractor in Jacksonville mainly doing work in Clay county I am in need of a dumpster for dump trailers for roofing work I usually have 1-2 jobs per week but we have a small crew who does really good work and takes their time and they are usually bigger roofs 40-60 squares but I had someone who was giving me a pretty good deal at $400 per with no overage which I know is a really good deal but they just don’t have enough dumps for me as they do other work other than just mine so I’m looking for someone else to maybe just use permanently. I want to be fair but I’d also like a 1 cost deal as well so no pressure if it doesn’t make sense but if anyone is looking for more business and to do a deal like that I have a pretty consistent flow of business and would love to do work together. Just feel free to comment here. Thanks.


r/Contractor • • 4h ago

Tips for glue down hardwood floors over concrete?

Post image
1 Upvotes

I’ve laid plenty of nail down hard wood floors , pergo floors, I’ve done a bit of tile, this will be my first time tackling a hardwood floor with glue.

Any insights or tips ? Anything will be appreciated. Approx 210sqft so it’s not much at all.

There was one previously laid on this floor , was torn up due to flooding. Concrete is 100% ready for new floor.


r/Contractor • • 12h ago

PACE program experience in CA

0 Upvotes

Hi all,
I want to ask if anyone did a job where you helped a customer with the Pace paperwork. Did you have a good or bad experience. Thank you


r/Contractor • • 14h ago

Why is it so hard to find an old used dump trailer for sale?

5 Upvotes

All I need is a 7x14 dump trailer with 7k axles… everything I see is at most 5 years old. I’d love to find an old rusty one for a good price and fix it up and maybe even wrap it! Anyone got any ideas on finding one?


r/Contractor • • 8h ago

Fieldstone basement insulation?

Thumbnail gallery
1 Upvotes

r/Contractor • • 14h ago

Pool Contractors — Is This Normal?

Thumbnail reddit.com
1 Upvotes

I'm a 70-year-old single homeowner, and I'm simply trying to give my existing pool a modest makeover. I'm looking for the least expensive standard plaster, basic waterline tile, and less expensive coping. No upgrades, no luxury materials, and no elaborate renovation.

I've been doing my homework and getting comparison quotes. One company already quoted me $15,195 for the work I requested from another company.

The second company came out, and the representative stayed approximately two hours, repeatedly going over the same things. Eventually, he sat in my house and wrote a quote of approximately $38,500 on a piece of paper. I asked several times whether he would send an official written estimate. His answer was, "I can." He left, and nearly midnight arrived without an official estimate.

Yet before leaving, he was pressuring me to commit. He even said that if I decided a week later not to go ahead, he would go outside and cry, although he would understand!

I repeatedly explained that I wasn't interested in spending money I might eventually need for long-term healthcare. I simply wanted to keep my pool looking nice. He was trying to sell me a much more elaborate project, and the funny part? When he showed me his sample board, he didn't even have the materials I was interested in available.

The experience left me discouraged, so I'm putting the project on hold.

And the company that quoted me $15,195 hasn't exactly followed through either. I requested references, proof of insurance, and information about a pool-cover contact he recommended. None of that was provided. I even asked him for a quote on a few small repairs instead of the full project. He replied, "Yes, I can get on that for you," but I still don't have the quote.

These are businesses I researched and found to be legitimate companies.

Is this what dealing with pool contractors has become? Am I wrong to expect written estimates, promised documentation, and straightforward communication before spending this kind of money?


r/Contractor • • 23h ago

Cause of damage?

Post image
1 Upvotes

I’ve never seen damage like this before. Is this caused by mould or moisture?


r/Contractor • • 1h ago

The one number most small remodelers don't track: over/under billing

3 Upvotes

I'm the controller at a remodeling company. The thing I see trip up small contractors more than anything isn't bad estimating. It's not knowing whether you've billed ahead of the work or behind it.

Quick version:

  1. Take actual cost to date divided by projected final cost. That's your % complete.
  2. Multiply that by your contract (including approved change orders). That's what you've actually earned.
  3. Subtract that from what you've invoiced.

Positive = you're overbilled. Good for cash, but that money isn't profit yet.

Negative = you're underbilled. You're financing the job for your client.

If you're running 3 jobs that are all underbilled, that's usually why the bank account feels tight even when the jobs look profitable on paper.

The other one is profit fade: what the estimate said you'd make vs. what you're projected to make now. Checking it weekly catches a bleeding job while you can still fix it.

Happy to answer questions.