I hired someone to add this wall. He used 1/2" cement board. But among other things, there's 23" between the two leftmost vertical studs. It's missing support at the tub lip and seam. And there's no 1/8" gap at the seam.
Another tiler I talked to said this would be fine. But I can see it flex a bit above the tub when I press from the back.
I wonder if I need to take it all off and add one more vertical stud in the middle and then horizontal supports at the tub lip and seam? Anything else?
If I do that, for the horizontal pieces, can I put a 2x4 flat, with the wide part facing out? I know it might flex a bit that way, but I'm not sure how else I'll fit it in front of the pipes.
And I can't hang cement board by myself, so I think I'll have to buy a bunch of Kerdi or GoBoard to replace what's there.
Thanks for thoughts!
P.S. I know it's a mess how the tub surround is farther out than the drywall. That's a whole other sob story.